Transparent,
turnkey pricing: Imagine, if you will: Turning the
key and moving in; everything taken care of! With Timeless Homes, we promise
that is exactly what will happen, unless of course, you would prefer to do
things yourself. That’s right – we can do it all, from turning sod to, well,
planting grass. If you would prefer a more hands-on approach, carrying out
some work yourself, we will be happy to oblige.
Rates per sq.m: Building costs vary greatly
depending on the costs of fittings, fixtures and finishes. We prefer to give
indicative prices based upon a ‘Fully Complete’ home, excluding only
furniture and drapes. Based upon some traditional homes we’ve designed and
priced, here are some indicative rates:
|
Indicative
sq.m rates
|
From $/m²
|
|
Indicative Square
Metre Rates:
Square Metre rates vary depending on numerous factors.
Some of these factors are:
- Wind,
earthquake and snow-loading requirements.
- Building
size. Smaller buildings have higher sq.m rates than larger buildings.
- Building
complexity, single or double storey or more floors.
- Fittings,
fixtures and finishes selection.
- Historically
correct detailing.
- Site
conditions, site slope, soil conditions and geotechnical factors.
Variations to
indicative rates:
These variations are indicative for average dwelling
sizes, situated on average size town lots or on rural sections. Each and
every site is different, so each project can have different prices for
these items. We have, by looking at historical data from several projects,
arrived at indicative rates for the average home size. Larger homes will
generally have lover figures added for these services / materials and
smaller homes will have higher amounts added.
Energy Efficiency
Upgrades:
Combining at least three out of these five ‘add-ons’
will provide you with a highly energy efficient home. When clients add
these ‘add-ons’ they typically experience much higher comfort levels in
their homes and greatly reduced energy expenditure, especially for heating
and cooling costs. It is possible to have up to 75% savings over heating
and cooling costs in the average new home, built to or beyond building code
requirements. We like to remind customers that Building Code Standard is
“pretty standard” and not necessarily that great! We can, and routinely do
much better. You really can have a new home and have minimal heating and
cooling costs.
Further changes to
above rates:
These figures are indicative based upon recent prices
calculated for our clients. Some clients prefer to do their own painting.
Others may have their own plumber or electrician. We are very flexible and
will always work with you to make your dream home a reality.
These indicative rates include GST. Rates subject to
change without notice.
|
|
Dwelling,
2.4m stud height
|
$
1,350.00
|
|
|
Dwelling,
2.7m stud height
|
$
1,450.00
|
|
|
Dwelling,
3.0m stud height
|
$
1,650.00
|
|
|
Covered
Verandah
|
$
600.00
|
|
|
Open
Deck / Paving
|
$
300.00
|
|
|
Garages
|
$
400.00
|
|
|
Variations
to rates above
|
Add (from) $/m²
|
|
Driveways
/ Paths
|
$
25.00
|
|
|
Rural
Services
|
$
200.00
|
|
|
All
Floor Coverings
|
$
65.00
|
|
|
All
Appliances
|
$
20.00
|
|
|
Highly
decorative detailing
|
$
100.00
|
|
|
Council
Consent Fees
|
$
15.00
|
|
|
Sustainable
hardwood decking
|
$ 250.00
|
|
|
(To
verandah or deck cost only)
|
|
|
|
Windows
savings if ventilation
|
Deduct (from) $/m²
|
|
system
is installed
|
$ 20.00
|
|
|
Energy
Efficiency Upgrades
|
Add
(from) $/m²
|
|
Thermal
Mass Floor
|
$
85.00
|
|
|
Solar
Water Heating
|
$
30.00
|
|
|
N50
Test Compliance
|
$
60.00
|
|
|
Cold
climate insulation
|
$
17.00
|
|
|
Whole
house ventilation system
|
$
30.00
|
|
|
Ventilation
& windows combined
|
$
10.00
|
|
|
Further
changes to above rates
|
Deduct
(from) $/m²
|
|
Painting,
External
|
$
90.00
|
|
|
Painting,
Internal
|
$
80.00
|
|
Rates
updated November 2010
|
Of course, all work carried out, by us or by our
sub-contractors as part of the construction contract is covered by the Master Builder 10-Year New Home or
Alteration and Addition Premium or Classic Guarantee.
Our price will be presented to you clearly identifying what is included and
what is not. Furthermore, we will actually show you the break-down of staged
payments; completely transparent pricing, no hidden extras or exclusions.
We will provide you
with a free, all inclusive quotation. Our quotation will be presented in the standard Master Builder Payment Schedule
format:
This means, you only pay a 5% deposit and for all other work, you only pay at the completion of that stage of the work.
|
Contract
price is made up of the following parts:
|
|
A
|
Contract
Deposit
|
5%
|
|
B
|
Other
Items: As
listed in the Special Conditions of the Contract
|
|
|
|
Site
Works, Site Services
|
¾
|
Payment
upon completion of each stage of the work. If you build with us, the
Building Permit Ready drawings are provided free of charge.
|
|
|
Consent
Fees
|
|
|
Engineering
Fees
|
|
|
Architectural
Design Fees
|
|
|
|
|
C
|
Dwelling
Cost: Contract
Price less items above.
|
|
|
|
Staged
Payments below are a percentage of Dwelling cost only.
|
|
|
Upon
substantial completion of the following stages:
|
|
|
(i)
|
Foundation
and Floor Structure
|
7%
|
|
(ii)
|
All
Wall Framing
|
14%
|
|
(iii)
|
All
Roof Framing
|
5%
|
|
(iv)
|
The
Roof and Fascia
|
6%
|
|
(v)
|
All
Exterior Doors and Windows
|
8%
|
|
(vi)
|
All
Exterior Wall Linings and/or Veneers
|
6%
|
|
(vii)
|
All
Exterior Decoration or Coatings
|
5%
|
|
(viii)
|
Installation
of Pre-Wire, Pre-Plumb and Insulation
|
3%
|
|
(ix)
|
All
Interior Linings
|
8%
|
|
(x)
|
Interior
Doors, Architraves and Scotia
|
5%
|
|
(xi)
|
Internal
Stopping, Completed and Sanded
|
3%
|
|
(xii)
|
All
Interior Decoration or Coatings
|
5%
|
|
(xiii)
|
Kitchens
and Bathrooms
|
10%
|
|
(xiv)
|
Plumbing
and Electrical
|
5%
|
|
(xv)
|
Hardware
and Tiling
|
5%
|
|
(xvi)
|
FINAL
PAYMENT Upon
Completion of the Works, the balance of the Contract Price is payable
before the Owner takes possession.
|
5%
|
|
Note: Stage percentages may alter depending on
the nature of the project.
|
|
|
|
|
|
Read on? The next section is Timely Construction.