Designers and Builders, for Timeless Architecture, Timely Construction

 

Transparent, turnkey pricing: Imagine, if you will: Turning the key and moving in; everything taken care of! With Timeless Homes, we promise that is exactly what will happen, unless of course, you would prefer to do things yourself. That’s right – we can do it all, from turning sod to, well, planting grass. If you would prefer a more hands-on approach, carrying out some work yourself, we will be happy to oblige.

 

Rates per sq.m: Building costs vary greatly depending on the costs of fittings, fixtures and finishes. We prefer to give indicative prices based upon a ‘Fully Complete’ home, excluding only furniture and drapes. Based upon some traditional homes we’ve designed and priced, here are some indicative rates:

 

Indicative sq.m rates

 From $/m²

 

Indicative Square Metre Rates:

Square Metre rates vary depending on numerous factors. Some of these factors are:

  1. Wind, earthquake and snow-loading requirements.
  2. Building size. Smaller buildings have higher sq.m rates than larger buildings.
  3. Building complexity, single or double storey or more floors.
  4. Fittings, fixtures and finishes selection.
  5. Historically correct detailing.
  6. Site conditions, site slope, soil conditions and geotechnical factors.

Variations to indicative rates:

These variations are indicative for average dwelling sizes, situated on average size town lots or on rural sections. Each and every site is different, so each project can have different prices for these items. We have, by looking at historical data from several projects, arrived at indicative rates for the average home size. Larger homes will generally have lover figures added for these services / materials and smaller homes will have higher amounts added.

Energy Efficiency Upgrades:

Combining at least three out of these five ‘add-ons’ will provide you with a highly energy efficient home. When clients add these ‘add-ons’ they typically experience much higher comfort levels in their homes and greatly reduced energy expenditure, especially for heating and cooling costs. It is possible to have up to 75% savings over heating and cooling costs in the average new home, built to or beyond building code requirements. We like to remind customers that Building Code Standard is “pretty standard” and not necessarily that great! We can, and routinely do much better. You really can have a new home and have minimal heating and cooling costs.

Further changes to above rates:

These figures are indicative based upon recent prices calculated for our clients. Some clients prefer to do their own painting. Others may have their own plumber or electrician. We are very flexible and will always work with you to make your dream home a reality.

These indicative rates include GST. Rates subject to change without notice.

Dwelling, 2.4m stud height

 $  1,350.00

 

Dwelling, 2.7m stud height

 $  1,450.00

 

Dwelling, 3.0m stud height

 $  1,650.00

 

Covered Verandah

 $     600.00

 

Open Deck / Paving

 $     300.00

 

Garages

 $     400.00

 

Variations to rates above

 Add (from) $/m²

Driveways / Paths

 $      25.00

 

Rural Services

 $    200.00

 

All Floor Coverings

 $      65.00

 

All Appliances

 $      20.00

 

Highly decorative detailing

 $    100.00

 

Council Consent Fees

 $      15.00

 

Sustainable hardwood decking

 $    250.00

 

(To verandah or deck cost only)

 

 

Windows savings if ventilation

 Deduct (from) $/m²

system is installed

$      20.00

 

Energy Efficiency Upgrades

Add (from) $/m²

Thermal Mass Floor

 $      85.00

 

Solar Water Heating

 $      30.00

 

N50 Test Compliance

 $      60.00

 

Cold climate insulation

 $      17.00

 

Whole house ventilation system

 $      30.00

 

Ventilation & windows combined

 $      10.00

 

Further changes to above rates

Deduct (from) $/m²

Painting, External

 $      90.00

 

Painting, Internal

 $      80.00

 

Rates updated November 2010

 

Of course, all work carried out, by us or by our sub-contractors as part of the construction contract is covered by the Master Builder 10-Year New Home or Alteration and Addition Premium or Classic Guarantee. Our price will be presented to you clearly identifying what is included and what is not. Furthermore, we will actually show you the break-down of staged payments; completely transparent pricing, no hidden extras or exclusions.

 

We will provide you with a free, all inclusive quotation. Our quotation will be presented in the standard Master Builder Payment Schedule format:

This means, you only pay a 5% deposit and for all other work, you only pay at the completion of that stage of the work.

 

Contract price is made up of the following parts:

A

Contract Deposit

5%

B

Other Items: As listed in the Special Conditions of the Contract

 

 

Site Works, Site Services

¾

Payment upon completion of each stage of the work. If you build with us, the Building Permit Ready drawings are provided free of charge.

 

 

Consent Fees

 

Engineering Fees

 

Architectural Design Fees

 

 

C

Dwelling Cost: Contract Price less items above.

 

 

Staged Payments below are a percentage of Dwelling cost only.

 

Upon substantial completion of the following stages:

 

(i)

Foundation and Floor Structure

7%

(ii)

All Wall Framing

14%

(iii)

All Roof Framing

5%

(iv)

The Roof and Fascia

6%

(v)

All Exterior Doors and Windows

8%

(vi)

All Exterior Wall Linings and/or Veneers

6%

(vii)

All Exterior Decoration or Coatings

5%

(viii)

Installation of Pre-Wire, Pre-Plumb and Insulation

3%

(ix)

All Interior Linings

8%

(x)

Interior Doors, Architraves and Scotia

5%

(xi)

Internal Stopping, Completed and Sanded

3%

(xii)

All Interior Decoration or Coatings

5%

(xiii)

Kitchens and Bathrooms

10%

(xiv)

Plumbing and Electrical

5%

(xv)

Hardware and Tiling

5%

(xvi)

FINAL PAYMENT Upon Completion of the Works, the balance of the Contract Price is payable before the Owner takes possession.

5%

Note: Stage percentages may alter depending on the nature of the project.

 

Read on? The next section is Timely Construction.